Skip to content
Media 1 for listing Contemporary S-Curve Seating & Greenery Set

Description

This high-quality 3D model features a modular Urban Park and Plaza design, perfect for luxury residential projects, commercial landscapes, or city planning visualizations. The centerpiece is a series of S-shaped modular seating units integrated with vibrant red planters, creating a contemporary and inviting social space.

The environment is built on a detailed wood decking platform, surrounded by lush greenery, including realistic trees, flowering shrubs, and manicured grass areas. This asset is designed to be easily integrated into larger scenes or used as a standalone modular unit for exterior architectural visualization.

Key Features:

• Modular Versatility: The S-shaped benches and planters can be rearranged or duplicated to fit various site configurations.

• High-Detail Vegetation: Includes a diverse mix of botanically accurate trees and flowering plants, optimized for close-up renders.

• Contemporary Materials: Features a striking contrast between natural wood decking, organic greenery, and bold red architectural accents.

• ArchViz Ready: Perfectly suited for high-end architectural renderings, urban development proposals, and realistic game environments.

________________________________________

Technical Specifications

• Geometry: Total Polygonal: 2758512 Total Verts: 4060630

• Geometry Average per asset: Polygonal: 50095 Total Verts: 36304

• Textures: Included (Diffuse, Normal, Roughness)

• Materials: PBR Ready

• Scale: Real-world metric scale

• Format: [3dsMax, Vray, Corona, Blender, OBJ, FBX, GLtf, STL,USD]

Included formats